Browse:
While the Connections Centre is closed, the rest of the 1st floor - including washrooms, printers, and Service Desk - will remain open and accessible.
During façade construction Mills’ 6th floor silent study space and Learning Commons (2nd floor) will be closed. We anticipate these spaces will remain closed for the duration of the Mills façade construction.
Silent study will be relocated to the 3rd floor Laptop Room (L302). While the Learning Commons study space will be closed, the washrooms (including the accessible/gender neutral washroom), water fountain, Popular Reading Collection, and vending machines will still be available.
Was this helpful? 0 0