Browse:
The Connection Centre HVAC project involves drilling into the Centre’s concrete floor, and is therefore expected to cause significant noise disruption and vibration.
The façade construction will cause intermittent noise disruption. Ear plugs are available at the 1st floor Service Desk. Air quality inside the library will be monitored throughout the project, please contact library@mcmaster.ca if you have concerns.
Was this helpful? 0 0